Perbandingan Estimasi Anggaran Biaya Antara Harga SNI Dengan Harga Kontraktor Pada Proyek Pembangunan Pagar di Kandangan Surabaya

Authors

  • Akhmad Andi Saputra Universitas Gresik
  • Dandy Nugroho Universitas Gresik
  • Feri Sukmana Universitas Gresik

Abstract

The implementation of a construction project is a mechanical series of activities or works that are complex, multi-layered and interdependent. Building construction activities in the field of construction, we need a basic means of calculation of Principal Unit Price Analysis (AHSPK). Contractors are more likely to calculate the price of the work unit based on their own analysis based on previous experience in completing a construction work, although it is inseparable from SNI analysis (Indonesian National Standardization). The research method in analyzing the Budget Plan (RAB), namely the SNI and Contractor Calculation Methods. From the calculation of each analysis of the existing budget plan, the results obtained are a comparison of the budget plan between the SNI method with the Contractor Method. A more economical cost budget plan using the Contractor Method is IDR 548,564,455.00 while the results of the analysis of the SNI cost budget plan is IDR 1,151,860,112.11.

Keywords: Budget, Comparison, Contractor, Cost, Estimation, Price, SNI.

10.5281/zenodo.5105100

References

H. B. Ibrahim, Rencana Dan Estimate Real of Cost. Jakarta: Bumi Aksara, 2001.

D. Nugroho and R. Marleno, "OPTIMASI WAKTU DAN BIAYA PROYEK REVITALISASI PASAR KRATON KOTA TEGAL DENGAN METODE TIME COST TRADE OFF," Untag Surabaya, 2020.

C. Chotimah, "PENJADWALAN ULANG TERHADAP WAKTU UNTUK OPTIMASI BIAYA PROYEK PEMBANGUNAN RED DOORZ KERTOMENANGGAL DENGAN METODE TIME COST TRADE OFF," Untag 1945 Surabaya, 2020.

F. N. Lantang, B. F. Sompie, and G. Y. J. J. S. S. Malingkas, "Perencanaan Biaya Dengan Menggunakan Perhitungan Biaya Nyata pada Proyek Perumahan (Studi Kasus Perumahan Green Hill Residence)," vol. 2, no. 2, 2014.

Y. A. Messah, D. A. Sina, and C. C. J. J. t. s. Manubulu, "Analisa Indeks Biaya Untuk Pekerjaan Beton Bertulang Dengan Menggunakan Metode Sni 7394-2008 Dan Lapangan (Studi Kasus Pada Proyek Pembangunan Asrama STIKES Chmk Tahap III)," vol. 2, no. 1, pp. 49-62, 2013.

I. Bachtiar, Rencana Dan Estimasi Real of Coast. Jakarta: Bumi Aksara, 1993.

Published

2020-06-14

How to Cite

Andi Saputra, A., Nugroho, D., & Sukmana, F. (2020). Perbandingan Estimasi Anggaran Biaya Antara Harga SNI Dengan Harga Kontraktor Pada Proyek Pembangunan Pagar di Kandangan Surabaya. Wahana Teknik, 9(1), 21–29. Retrieved from https://journal.unigres.ac.id/index.php/WahanaTeknik/article/view/1346