The relationship of risk factors to the performance project becomes veryimportant in improving the efficiency and the steps that can be done to address these risk factors. The process of risk management project is the identification of risk factor, risk analysis, risk evaluation and risk management measures. The objective of this study is to find out the risk factors affecting the performance project of a self managed building construction management in a CV. Gresik Mitra Teknik. Research to determine the risk factor conducted qualitatively, by analyzing the perception data obtained from interviews, observations, and documentation. The result of the data analysis shows there are two major risk factors that affect the performance project in CV. Gresik Mitra Tekhnik, that is : changes in project execution schedule and labor recruitment is not timely.

 

Keywords : Risk Management, Risk Factors, Performance Project, and Construction.


DOI : 10.5281/zenodo.3474551

References

Asiyanto, 2005. Manajemen Produksi untukJasa Konstruksi. Pradnya Paramita.Jakarta.

Asmarantaka, Nadya Safira. Analisis Resikoyang Berpengaruh Terhadap Kinerja Proyek Pada Pembangunan Hotel Batiqa Palembang. Jurnal TeknikSipil dan Lingkungan, Vol. 2, No.3, September 2014.

Fahmi, Irham, 2016. Manajemen RisikoTeori, Kasus, dan Solusi. Edisi Revisi. Cetakan Keenam. ALFABETA. Bandung.

Hery, 2015. Manajemen Risiko Bisnis. Grasindo. Jakarta.

Ismael, Idzurnida. Faktor-faktor Risiko yang Berpengaruh Terhadap Kinerja Kualitas Proyek Konstruksi Gedung di Kota Padang Sumatera Barat Dengan Menggunakan Model dan Simulasi Monte Carlo. Jurnal Momentum, Vol. 13, No.2, Agustus 2012.

Maddeppungeng, Bethary, dan Ayu. Identifikasi Faktor-faktor Risiko yang Berpengaruh di Tahap Construction Pada Proyek EPC Terhadap Kinerja Waktu (studikasus: PT Krakatau Engineering dan PT Prima Konstruksi Utama). Jurnal Fondasi,Vol. 4, No.2, 2015.

Manuaba, Ida Bagus Gde, 2010. IdentifikasiFaktor Risiko Terhadap Kinerja Waktu Pada Pelaksaan Pekerjaan Pengamanan Pantai Di Bali. Jurnal Fakultas Teknik, Universitas Dwijendra. Risiko. Cetakan Kesatu. PUSTAKA SETIA. Bandung.

Mulyawan, Setia, 2015. Manajemen Secara Swakelola (studikasus: proyek pengembangan sekolah menengah kejuruan di Provinsi Aceh). JurnalTeknik Sipil, Vol. 1, No.1, Agustus 2012.

Pratama, Andhika Manggala, 2011. FaktorPenyebab Terjadinya Risiko yang Mempengaruhi Kinerja Waktu Proyek Konstruksi Fly Over KP Melayu-Tanah Abang. Skripsi. FakultasTeknik Program Sarjana UI. Jakarta.

Ramli, Soehatman, 2010. Pedoman Praktis Manajemen Risiko dalam Perspektif K3 OHS Risk Management. Cetakan Pertama. Dian Rakyat. Jakarta.

Rusman, Muttaqin, dan Malahayati, Nurul. Faktor- factor Resiko yang Mempengaruhi Kinerja Waktu Pelaksanaan Konstruksi Gedung

Silalahi, Ulber, 2010. Metode Penelitian Sosial. Cetakan Kedua. Refika Aditama. Bandung.

Sugiyono, 2010. Memahami Penelitian Kualitatif. Cetakan Keenam. ALFABETA. Bandung.

Sugiyono, 2015. Metode Penelitian Kuantitatif, Kualitatif dan R&D. Best Seller. Cetakan Ke-22. ALFABETA. Bandung.

Syarizka, Deandra, 2017. Pasar Konstruksi Indonesia Diprediksi Capai US$ 136,26 Miliar Pada 2021. Ed: Mia Chitra Dinisari, Bisnis.com

Wibowo, 2016. Manajemen Kinerja. Edisi Kelima. Cetakan Kesepuluh. Raja grafindo Persada. Jakarta

Published

2019-09-14

Issue

Section

Artikel