Analisis Metode Pengendalian Pemesanan Bahan Baku Penolong Roda Kereta Api (Bogie) PT. Barata Indonesia Di Gresik

Authors

  • Umi Elan
  • Mohammad Alvin Fahmi

DOI:

https://doi.org/10.55129/gemaekonomi.v8i1.887

Abstract

This study tries to study the method of converting the auxiliary raw materials for the best train wheels (bogie) at PT. Barata Indonesia. This research is important in reducing the total cost of completion issued by PT. Barata Indonesia. This study uses descriptive quantitative method of submission of raw materials in the form of Economic Order Quantity (EOQ), and Just In Time (JIT). Pepset P-02 will be better by using the Economic Order Quantity (EOQ) method, while the control of Kalminex Type FM 100-A100 / 130 raw materials will be better by using the Just In Time (JIT) method

 

Keyword: EOQ, JIT, Total Inventory Cost


DOI : 10.5281/zenodo.3474547

References

Andhika,Benedictus P.D. 2014.Sistem Pengendalian Bahan Baku dengan Metode Just In Time (JIT) pada Ashpalt MixingPlant PT. TMPI (Bandung, Jawa Barat).

Dania, et.al. 2015. Aplikasi Just in Time Pada Perencanaan dan Pengendalian Persediaan Bahan Kentang (Malang,JawaTimur).

Dangnga, Taslim M. 2014. Manajemen Penerapan Metode Economic Order Quantity dan Reorder Point Untuk Pengendalian Persediaan Bahan baku Pada P.T. Japfa Comfeed Indonesia Tbk. di Kota Makassar (Makassar, Sulawesi Selatan).

Daud, Muhammad Nur. 2017. Analisis Pengendalian Bahan Baku Produksi Roti Wilton Kuala Simpang (KualaSimpang, Aceh).

Jurnal Samudra Ekonomi Dan Bisnis 8:760-774. Hakim, Luqman. 2015. Implementasi Just In Time Dalam Meningkatkan Produktivitas Dan EfisiensiBiayaProduksi (Sidoarjo, JawaTimur). Journal of Research and Technology 1:1-8.

Haming, Murdifin dan Mahfud Nurnajamuddin. 2011. Manajemen Produksi Modern. Edisi Kedua. Jakarta: PT BumiAksara.

Handoko, T. Hani. 2011. Dasar-dasar Manajemen Produksi dan Operasi.Edisi Satu.Yogyakarta : BPFE Yogyakarta.

Madianto, Azhar, Dzulkirom ar dan Dwiatmanto. 2016. Analisis Implementasi Sistem Just In Time (JIT) Pada Persediaan Bahan Baku Untuk Memenuhi Kebutuhan Produksi (Malang, JawaTimur). Jurnal Administrasi Bisnis (JAB) 38:183-190.

Maharani, M.H. dan Mustafa Kamal. 2015. Perbandingan Sistem Economic Order Quantity dan Just in Time pada Pengendalian Persediaan Bahan Baku(Semarang, Jawa Tengah). Diponegoro Journal of Management 4:1-15.

Pamungkas, Wahyu T. danAftoni Sutanto. 2012. Analisis Pengendalian Bahan Baku Menggunakan Metode EOQ (Economic Order Quantity) (Studi Kasus Pada PT. Misaja Mitra Co.Ltd). Jurnal Ilmiah

Putra, Christyandhika. 2014. Penerapan Metode Just In Time untuk Meningkatkan Efisiensi Biaya Persediaan Bahan Baku (Surabaya,JawaTimur). Jurnal Ilmu & RisetAkuntansi 3:1-20.

Sugiyono. 2010. MetodePenelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.

Published

2019-09-14

Issue

Section

Artikel